Automotive Parts Factory - 1.2MW Rooftop Array
The Problem:
The client faced extremely high grid tariffs which were eroding profit margins on their heavy-machinery production lines. Consistent grid fluctuation also risked sensitive robotics.
The Solution:
National Solar engineered a comprehensive 1.2MW grid-synchronized rooftop system, optimally angling panels over their expansive factory sheds to maximize yield while accommodating old roof strains.
Measurable Results:
- 42% reduction in monthly electricity overheads
- ROI payback projected in 3.6 years
- 1,400+ tons of CO2 offset annually